Ghumo LIVE
Trains 📊 Chart 🔍 PNR Track 📅 Avail
🚆 Coach Position · Train 13182

13182 KAZIRANGA EXP Coach Position

13182 mein coach position dekhein — mera coach platform par kahaan rukega? Engine se rear tak full rake layout.

KAZIRANGA EXP (13182) runs from SILGHAT TOWN to KOLKATA CHITPUR in 22h 20m · classes: 2A, 3A, 3E, SL.

13:45
Departs SHTT
12:05
Arrives KOAA
20
Stops
4
Classes

Coach Position & Platform Number of 13182 KAZIRANGA EXP Today

Find the coach position of 13182 KAZIRANGA EXP — the order in which coaches like S1, S2, B1, B2, A1, M1, GEN, SLR are arranged in the rake from the engine — along with the platform number at SILGHAT TOWN, KOLKATA CHITPUR and every halt en route. Coach layout and platform information for 13182 is published on the live chart approximately 4 hours before departure.

📅 15-Day Availability for 13182 → ▶ Open Live Chart for 13182 →

Coach order is fixed by the rake; coach positions and platform numbers become accurate ~4 hrs before departure when Indian Railways prepares the chart.

13182 Coach Layout · Engine to Brake Van

Latest rake composition for 13182 KAZIRANGA EXP.

VP #1
LPR #2
GEN #3
GEN #4
A2
2A #5
A1
2A #6
B4
3A #7
B3
3A #8
B2
3A #9
B1
3A #10
M3
3E #11
M2
3E #12
M1
3E #13
S7
SL #14
S6
SL #15
S5
SL #16
S4
SL #17
S3
SL #18
S2
SL #19
S1
SL #20
GEN #21
GEN #22
← Front (engine end) 22 coaches Rear end →

Total 22 coaches · 4 general (GEN). ⏱ See vacant berths per coach → (live, ~4 hrs before departure).

Platform Number for 13182 at Each Station

Platform (PF) at which 13182 KAZIRANGA EXP halts, along the SILGHAT TOWN → KOLKATA CHITPUR route.

#StationPlatformDivyangjan Coach Pos
1 SHTT PF 1
2 JKB
7 NGAN
8 SCE PF 1
12 CPK PF 1
17 JID PF 1
28 GHY PF 1
29 KYQ
41 GLPT PF 2
46 NBQ PF 1
52 FKM PF 1
59 NOQ PF 2
61 NCB PF 2
79 NJP PF 6
89 KNE PF 1
118 MLDT PF 2
139 RPH PF 1
148 BHP PF 2
157 BWN
192 KOAA PF 5

Platforms can change at the last minute — verify on the station announcement board.

How to Read 13182 Coach Position

On the live chart, coaches are listed in order from engine → brake van. The first coach after the loco is usually SLR/EOG, followed by general (GEN), sleeper (S1–S11), 3AC (B1–B3), 2AC (A1–A2), 1AC (H1), pantry car (PC), and another SLR at the rear. Coach codes you'll see for 13182:

CodeClassTypical Position
H1, HA11AC — First ACNear engine (premium, fewest coaches)
A1, A2, A32AC — Second AC Two-TierFront-middle of rake
B1, B2, B3, B4, B53AC — Third AC Three-TierMiddle of rake
M1, M23E — 3AC EconomyMiddle of rake (newer coaches)
S1, S2 … S11SL — Sleeper ClassMiddle to rear of rake
C1, C2 … C8CC — AC Chair Car (Shatabdi/Vande Bharat/Tejas)Most coaches in the rake
D1, D2 … D142S — Second Seating (Jan Shatabdi/Intercity)Most coaches in the rake
E1, E2EC — Executive Chair CarCentre of rake (premium chair)
GEN, GS, UR2S General — UnreservedEither end (next to SLR)
SLR, EOGBrake Van / Power Car (luggage + disabled berth)Both ends of the rake
PC, RAPantry Car / CateringCentre (where AC + sleeper meet)

Tip: For 13182 KAZIRANGA EXP, check the live chart 4 hours before departure to see which platform side the engine will be — this tells you whether to walk towards the front or rear of the platform to reach your coach quickly.

Train Details

Train Number13182
Train NameKAZIRANGA EXP
FromSILGHAT TOWN (SHTT)
ToKOLKATA CHITPUR (KOAA)
Departure13:45
Arrival12:05
Duration22h 20m
Classes2A, 3A, 3E, SL
TypeMAIL_EXPRESS
Running DaysTue

Route & Stops

#StationCodeArrivalDepartureHaltDistance
1 SILGHAT TOWN SHTT 13:45
2 JAKHALABANDHA JKB 13:56 13:58 2min 9 km
3 NAGAON NGAN 14:43 14:45 2min 55 km
4 SENCHOA JN SCE 14:52 14:54 2min 62 km
5 CHAPARMUKH JN CPK 15:24 15:26 2min 82 km
6 JAGI ROAD JID 15:51 15:53 2min 116 km
7 GUWAHATI GHY 17:25 17:40 15min 173 km
8 KAMAKHYA KYQ 18:08 18:10 2min 179 km
9 GOALPARA TOWN GLPT 20:02 20:04 2min 322 km
10 NEW BONGAIGAON NBQ 21:05 21:15 10min 381 km
11 FAKIRAGRAM JN FKM 21:53 21:55 2min 419 km
12 NEW ALIPURDUAR NOQ 22:43 22:45 2min 488 km
13 NEW COOCH BEHAR NCB 23:05 23:10 5min 506 km
14 NEW JALPAIGURI NJP 01:55 02:05 10min 632 km
15 KISHANGANJ KNE 03:10 03:12 2min 718 km
16 MALDA TOWN MLDT 06:05 06:15 10min 865 km
17 RAMPUR HAT RPH 08:05 08:07 2min 986 km
18 BOLPUR SHANTINIKETAN BHP 08:48 08:50 2min 1047 km
19 BARDDHAMAN JN BWN 09:40 09:42 2min 1098 km
20 KOLKATA CHITPUR KOAA 12:05 12:05 1195 km

🚆 Live Train Info → Track This Train → Check Availability → All Trains on Route →

Frequently Asked Questions

How do I find my coach position in 13182 KAZIRANGA EXP?

Coach position (S1, B2, A1, M1…) is fixed by the rake composition and shown on the live chart from about 4 hours before departure. The chart view shows engine direction, coach order and platform position.

Which platform does 13182 KAZIRANGA EXP arrive on?

Platform numbers for 13182 at SILGHAT TOWN, KOLKATA CHITPUR and intermediate stops are published along with the rake composition. The platform list above shows the latest platform number for every halt on this train's route. Platforms can change at short notice — always confirm on the station display board.

Does 13182 have a pantry car?

Pantry car presence depends on the rake. The live chart for 13182 marks PC/RA/SLR coaches when the composition is published.

What classes are available on 13182?

KAZIRANGA EXP offers 2A, 3A, 3E, SL classes.