75754 JBN-KIR DMU Coach Position
75754 mein coach position dekhein — mera coach platform par kahaan rukega? Engine se rear tak full rake layout.
JBN-KIR DMU (75754) runs from JOGBANI to KATIHAR JN in 03h 05m.
Coach Position & Platform Number of 75754 JBN-KIR DMU Today
Find the coach position of 75754 JBN-KIR DMU — the order in which coaches like S1, S2, B1, B2, A1, M1, GEN, SLR are arranged in the rake from the engine — along with the platform number at JOGBANI, KATIHAR JN and every halt en route. Coach layout and platform information for 75754 is published on the live chart approximately 4 hours before departure.
📅 15-Day Availability for 75754 → ▶ Open Live Chart for 75754 →
Coach order is fixed by the rake; coach positions and platform numbers become accurate ~4 hrs before departure when Indian Railways prepares the chart.
75754 Coach Layout · Engine to Brake Van
Latest rake composition for 75754 JBN-KIR DMU.
Total 10 coaches · 10 general (GEN). ⏱ See vacant berths per coach → (live, ~4 hrs before departure).
Platform Number for 75754 at Each Station
Platform (PF) at which 75754 JBN-KIR DMU halts, along the JOGBANI → KATIHAR JN route.
| # | Station | Platform | Divyangjan Coach Pos |
|---|---|---|---|
| 1 | JBN | PF 1 | |
| 2 | BTF | PF 1 | |
| 3 | FBG | PF 1 | |
| 4 | DLZ | — | |
| 5 | GPE | — | |
| 6 | SMH | PF 1 | |
| 7 | HOD | — | |
| 8 | ARR | PF 1 | |
| 9 | ARQ | PF 1 | |
| 10 | KSY | PF 1 | |
| 11 | SATR | — | |
| 12 | JAG | PF 1 | |
| 13 | GBN | — | |
| 14 | KUB | PF 1 | |
| 15 | PRNA | PF 1 | |
| 16 | RNX | PF 1 | |
| 17 | RWA | PF 1 | |
| 18 | DLF | PF 1 | |
| 19 | KIR | PF 3 |
Platforms can change at the last minute — verify on the station announcement board.
How to Read 75754 Coach Position
On the live chart, coaches are listed in order from engine → brake van. The first coach after the loco is usually SLR/EOG, followed by general (GEN), sleeper (S1–S11), 3AC (B1–B3), 2AC (A1–A2), 1AC (H1), pantry car (PC), and another SLR at the rear. Coach codes you'll see for 75754:
| Code | Class | Typical Position |
|---|---|---|
| H1, HA1 | 1AC — First AC | Near engine (premium, fewest coaches) |
| A1, A2, A3 | 2AC — Second AC Two-Tier | Front-middle of rake |
| B1, B2, B3, B4, B5 | 3AC — Third AC Three-Tier | Middle of rake |
| M1, M2 | 3E — 3AC Economy | Middle of rake (newer coaches) |
| S1, S2 … S11 | SL — Sleeper Class | Middle to rear of rake |
| C1, C2 … C8 | CC — AC Chair Car (Shatabdi/Vande Bharat/Tejas) | Most coaches in the rake |
| D1, D2 … D14 | 2S — Second Seating (Jan Shatabdi/Intercity) | Most coaches in the rake |
| E1, E2 | EC — Executive Chair Car | Centre of rake (premium chair) |
| GEN, GS, UR | 2S General — Unreserved | Either end (next to SLR) |
| SLR, EOG | Brake Van / Power Car (luggage + disabled berth) | Both ends of the rake |
| PC, RA | Pantry Car / Catering | Centre (where AC + sleeper meet) |
Tip: For 75754 JBN-KIR DMU, check the live chart 4 hours before departure to see which platform side the engine will be — this tells you whether to walk towards the front or rear of the platform to reach your coach quickly.
Train Details
| Train Number | 75754 |
|---|---|
| Train Name | JBN-KIR DMU |
| From | JOGBANI (JBN) |
| To | KATIHAR JN (KIR) |
| Departure | 10:15 |
| Arrival | 13:20 |
| Duration | 03h 05m |
| Classes | — |
| Type | ORDINARY |
| Running Days | Daily |
Route & Stops
| # | Station | Code | Arrival | Departure | Halt | Distance |
|---|---|---|---|---|---|---|
| 1 | JOGBANI | JBN | — | 10:30 | — | — |
| 2 | BATHNAHA | BTF | 10:38 | 10:39 | 1min | 7 km |
| 3 | FORBESGANJ | FBG | 10:46 | 10:48 | 2min | 13 km |
| 4 | DHOLBAJA | DLZ | 10:55 | 10:56 | 1min | 19 km |
| 5 | GOGIPOTHIA HALT | GPE | 11:01 | 11:02 | 1min | 22 km |
| 6 | SIMRAHA | SMH | 11:08 | 11:10 | 2min | 26 km |
| 7 | HALDITA BIHAR | HOD | 11:17 | 11:18 | 1min | 31 km |
| 8 | ARARIYA | ARR | 11:25 | 11:27 | 2min | 37 km |
| 9 | ARARIYA COURT | ARQ | 11:33 | 11:35 | 2min | 42 km |
| 10 | KUSIARGAON | KSY | 11:43 | 11:45 | 2min | 49 km |
| 11 | SATR HALT | SATR | 11:52 | 11:53 | 1min | 56 km |
| 12 | JALARGARH | JAG | 12:00 | 12:02 | 2min | 61 km |
| 13 | GARH BANAILI | GBN | 12:09 | 12:10 | 1min | 67 km |
| 14 | KASBA | KUB | 12:16 | 12:18 | 2min | 72 km |
| 15 | PURNIA JN | PRNA | 12:26 | 12:28 | 2min | 80 km |
| 16 | RANIPATRA | RNX | 12:44 | 12:45 | 1min | 87 km |
| 17 | RAUTARA | RWA | 12:53 | 12:54 | 1min | 94 km |
| 18 | DALAN | DLF | 13:02 | 13:03 | 1min | 102 km |
| 19 | KATIHAR JN | KIR | 13:30 | 13:30 | — | 108 km |
🚆 Live Train Info → Track This Train → Check Availability → All Trains on Route →
Frequently Asked Questions
How do I find my coach position in 75754 JBN-KIR DMU?
Coach position (S1, B2, A1, M1…) is fixed by the rake composition and shown on the live chart from about 4 hours before departure. The chart view shows engine direction, coach order and platform position.
Which platform does 75754 JBN-KIR DMU arrive on?
Platform numbers for 75754 at JOGBANI, KATIHAR JN and intermediate stops are published along with the rake composition. The platform list above shows the latest platform number for every halt on this train's route. Platforms can change at short notice — always confirm on the station display board.
Does 75754 have a pantry car?
Pantry car presence depends on the rake. The live chart for 75754 marks PC/RA/SLR coaches when the composition is published.
What classes are available on 75754?
JBN-KIR DMU.